Final drive
I have found results from200000+products and60000+suppliers aboutFinal drive
Hydraulic Travel Motor Assembly Final Drive for Hitachi Sany- Excavator
10-13ton Jeil 14TM Doosan TM18vc Hydraulic Travel Motor Final Drive for Sumitomo Sh120 Excavator
227-6188 / 2276188 Travel Motor Final Drive Assembly for C at 365c Ca T374D Excavator
Zx230-3 Zx240-3 Zx250-3 Zx230LC Excavator Final Drive for Hmgf40fa Hydraulic Travel Gearbox Motor 9195448 9181678
R220LC-9s 39q7-40100 R220-9 R225-9 R215-9 R210-9 R260-9 R210LC-7 Final Drive for Hyund*Ai Excavator Parts
Engineering Construction Machinery Parts Final Drive 208-27-00243 for PC400-7
High-Performance LG LG933L Wheel Loader Final Drive Assembly
Excavator Machinery Parts 21t-27-00400 Final Drive Assembly for PC2000
OEM Supply Final Drive for Mini Excavator Shantui 26
Hydraulic Planetary Final Drive Motors for Skid Steer Loaders
High Quality Metal End Face Seal Floating Seal Final Drive 195-27-00102
21n-27-00130 Final Drive for Komat Su PC1250-7 PC1250-8
Sdlg Wheel Loader L978 Final Drive 29070013321 for Sale
Ini Low Speed Final Drive PC130 Dh135 Sk130 HD450 E312 Hydraulic Excavator High Torque Hydraulic Track Drive Travel Motor
Ini Excavator 312b 312c 313c 330c 320b Travel Motor High Torque Planetary Gearbox Excavator Final Drive
GM06 Travel Motor/Final Drive for Yc60 E305.5 Sy55 PC40/50/56 Ihi50 Zax60
Travel Motor Final Drive for R210-7 Ec210c Sk200-6 Dh225
Kayaba Kyb Travel Motor Original Kyb Final Drive Mag-230vp
Durable Final Drive Reduction Gear for Sk350-8 Excavator
Gft60 Gft80 Gft110 Gft160 Gft220 Gft330 Atlas Copco Epiroc 57415929 Hydraulic Gft Hydraulic Final Drive
Excavator Hydraulic Final Drive PC400-8 Travel Motor 708-8j-71110 Final Drive Travel Devicer Assembly Part
21n-27-00131 Final Drive for Komatsu PC1250-11 Original Long Life Part Excavator Parts
Good Price Mantall 2 Bare Pacing China Wheel Loader Part Final Drive Self-Propelled Xe140W
418-7155 470-0474 4187155 4700474 Final Drive for 349d2 349e Excavator
Sourcing guidance for Final Drive
What are the key technical specifications to evaluate when sourcing a final drive?
When selecting a final drive, you must prioritize torque density and gear reduction ratios to ensure the unit matches the machine's hydraulic output. Key specs include the displacement (cc/rev), maximum operating pressure (typically 30-35 MPa), and output torque. Ensure the mounting dimensions (flange diameter and bolt hole patterns) are 100% compatible with your specific excavator or crawler model to avoid costly installation failures.
How can I verify the quality and durability of the internal components?
The longevity of a final drive depends on the heat treatment process of the planetary gears and the quality of the floating seals. Request suppliers to provide evidence of induction hardening or carburizing for gears to ensure a surface hardness of HRC 58-62. Additionally, verify that the unit uses high-grade bearings (such as NSK or SKF) and high-pressure resistant oil seals to prevent leakage and premature wear in harsh environments.
What compliance standards and certifications should a professional supplier possess?
Reliable manufacturers should hold ISO 9001:2015 certification for quality management systems. For hydraulic components, look for compliance with CE marking (for the European market) and evidence of rigorous factory testing, including 100% hydraulic leakage tests and noise level testing (typically <80dB) before shipment. Suppliers on Made-in-China.com with 'Audited Supplier' status provide an extra layer of verification regarding their production capabilities.
What are the common usage scenarios and maintenance requirements for final drives?
Final drives are critical for tracked construction machinery like excavators, bulldozers, and drill rigs. To ensure a service life of 5,000+ hours, buyers must emphasize regular gear oil changes (every 500-1,000 hours) and the use of high-viscosity extreme pressure (EP) lubricants. Advise end-users to check for metal shavings in the magnetic plug, which serves as an early warning sign of internal gear fatigue.
Cross-Border Procurement Risks and Strategic Advice
How can I mitigate the risk of receiving a final drive that doesn't fit my machine?
The most common risk is dimensional mismatch. Always provide the supplier with the machine model, part number, and the number of frame/sprocket bolt holes. Request a technical drawing (PDF or CAD) for approval before production. For customized OEM orders, a sample trial is highly recommended to verify hydraulic port alignment and travel speed synchronization.
What are the best practices for negotiating price and lead times with Chinese suppliers?
Focus on Total Cost of Ownership (TCO) rather than just the unit price. Negotiate for extended warranties (12-24 months) instead of small price cuts, as this proves the supplier's confidence in their product. For bulk orders, aim for a 10-15% discount at the 10-unit tier. Ensure the contract specifies a lead time (usually 7-15 days for stock items) with clear penalties for delays to protect your supply chain.
How should final drives be packaged and shipped to ensure safe arrival?
Final drives are heavy, high-precision hydraulic components. They must be shipped in fumigated wooden crates with internal shock-absorbing foam and anti-rust VCI bags. Since these units contain residual oil, ensure the supplier provides a Non-Hazardous Chemical Declaration to avoid customs delays. For international shipping, FOB or CIF terms are standard; however, ensure the cargo is insured for its full replacement value.
How can I ensure transaction security when dealing with overseas suppliers?
Utilize secure payment methods and prioritize suppliers on Made-in-China.com who offer Star Ratings and comprehensive audit reports. Always conduct a pre-shipment inspection (PSI)—either via a third-party agency or by requesting a video of the unit undergoing a pressure test with your specific serial number visible—to ensure the product meets the agreed-upon performance benchmarks before final payment.





























